Project | Dates | Area |
---|---|---|
Refurbishment of a 2.5MW; Turbo-Generator Package (Rolls-Royce Allison 501-KB) to a 3.5MW; Turbo-Generator Package (Rolls-Royce Allison 501-KB5) on Abkatun-D; including;Overhaul of the Gas Generator 501KB; No.ASP-142. Pemex, APLT |
2013 | PEP RMSO |
Refurbishment of a 2.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB) to a 3.5MW; Turbo- Generator Package (Rolls-Royce Allison 501-KB5) on Abkatun-A-Permenente; including: Overhaul of the Gas Generator 501KB; No.ASP-903. Pemex, APAPC. |
2011-2013 | PEP RMSO |
Removal and Replacement of TG-A 2.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB) with a 3.5MW; Turbo-Generator Package (Rolls-Royce Allison 501-KB5) on Abkatun-A-Permenente; Pemex, APAPC. Including: Installation; Testing; configuration and commissioning.. |
2011 | PEP RMSO |
Project | Dates | Area |
---|---|---|
Supply of Spare Parts; Refurbishment and Technical Assistance for Compression Modules No.4 & 5 (Rolls- Royce RB211) at CPTG; Pemex, GTPH, Atasta. |
2011 | PEP GTDH |
Modernization of the Control Systems on Compression Modules No.4 & 5 (Rolls-Royce RB211) at CPTG, Atasta, including installation, testing, configuration and commissioning. |
2011 | PEP GTDH |
Project | Dates | Area |
---|---|---|
Supply of Spare Parts; Refurbishment and Technical Assistance for Compression Modules No.4 & 5 (Rolls- Royce RB211) at CPTG Pemex, CPTG, GTDH, Atasta |
2011 | PEP GTDH |
Project | Dates | Area |
---|---|---|
Technical Assistence and Supervision of the installation of a Turbo-Generator Package (Rolls-Royce Allison 501-KB5) Pemex, APAPC, Abkatun-N1 |
2014-Present | PEP RMSO |
Technical Assistence and Supervision of the Installation of TG-3; Turbo-Generator Package (Rolls-Royce Allison 501-KB) Pemex, APLT, Abkatun-D |
2014-Present | PEP RMSO |
Training Course for the Operation and Maintenance of the Turbo-Generator Packages (Rolls-Royce Allison 501-KB5) for Pemex, APLT |
2013-2014 | PEP RMSO |
Technical Assistence for the Preventative Maintenance of TG-A and TG-C Turbo-Generator Packages (Rolls-Royce Allison 501-KB5) on Pemex, APAPC, Abkatun-A-Permenente. |
2013-2014 | PEP RMSO |
Refurbishment of a 2.5MW; Turbo-Generator Package (Rolls-Royce Allison 501-KB) to a 3.5MW; Turbo-Generator Package (Rolls-Royce Allison 501-KB5) on Abkatun-D; including;Overhaul of the Gas Generator 501KB; No.ASP-142. Pemex, APLT. |
2013 | PEP RMSO |
Technical Assistence for the Operation; Maintenance and Diagnosis of the Turbo-Generator Packages (Rolls-Royce Allison 501-KB) on Pemex, APLT, Abkatun-D |
2012 | PEP RMSO |
Training Course for the Operation and Maintenance of the Turbo-Generator Packages (Rolls-Royce Allison 501-KB5) for Pemex, APAPC |
2012 | PEP RMSO |
Technical Assistence for the Preventative Maintenance of TG-A and TG-C Turbo-Generator Packages (Rolls-Royce Allison 501-KB5) on Pemex, APAPC, Abkatun-A-Permenente. |
2012 | PEP RMSO |
Inspection and Evaluation of the Turbo-Generator Package; Gas Generator and Electrical Generator (Rolls- Royce Allison 501-KB) from Pemex, APLT, Abkatun-D. |
2011-2015 | PEP RMSO |
Refurbishment of a 2.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB) to a 3.5MW; Turbo- Generator Package (Rolls-Royce Allison 501-KB5) on Abkatun-A-Permenente; including: Overhaul of the Gas Generator 501KB; No.ASP-903. Pemex, APAPC. |
2011-2013 | PEP RMSO |
Technical Assistance for the replacement of the FT-55 Control System with a FT-125 Control System; TG-C Turbo-Generator Package (Rolls-Royce Allison 501-KB5) on Pemex, APAPC, Abkatun-A-Permenente. including: Installation; Testing; configuration and commissioning. |
2011 | PEP RMSO |
Removal and Replacement of TG-A 2.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB) with a 3.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB5) on Pemex, APAPC, Abkatun-A-Permenente. Including: Installation; Testing; configuration and commissioning. |
2011 | PEP RMSO |
Re-Commissioning of the TG-C Turbo-Generator Package (Rolls-Royce Allison 501-KB5) on Pemex, APAPC, Abkatun-A. |
2011 | PEP RMSO |
Project | Dates | Area |
---|---|---|
Field Service for the Inspection; Evaluation and installation of the Centrifugal Compressor Rotor (Rolls-Royce; Model RF2BB36; Serial No. 11348); Compression Station No.7; Cempoala. & Field Service for the Inspection; Evaluation of the Centrifugal Compressor Rotor (Rolls-Royce; Model RF2BB36; Serial No. 11347); Compression Station No.7; PGPB, Cempoala (Pemex Gas y Petroquimica Básica) |
2012 | PGPB |
Project | Dates | Area |
---|---|---|
Training Course for the Operation and Maintenance of the FT-55 Control Systems on the Reciprocating Compressors (Cooper-Bessemer; GMVA-8) at Pemex, Castarical, Region Sur. |
2011 | Pemex Región Sur |
Field Service for the Major Maintenace of the FT-55 Control Systems on the Reciprocating Compressors (Cooper-Bessemer; GMVA-8) at Pemex, Castarical, Region Sur. |
2011 | Pemex Región Sur |
Project | Sates | Area |
---|---|---|
Field Service on the L.T.S.A. (Long Term Service Agreement) Turbo-Compressor (Rolls-Royce RB-211) for CryoInfra, Tabasco |
2011 | Pemex Region Sur |
Field Service for the Major Maintenace of the FT-55 Control Systems on the Reciprocating Compressors (Cooper-Bessemer; GMVA-8) atPemex, Castarical, Region Sur. |
2011-Present | Private |
Project | Dates | Área |
---|---|---|
Modernization of the Control Systems on Compression Modules No.4 & 5 (Rolls-Royce RB211) at Pemex, CPTG, Atasta; including; installation; testing; configuration and commissioning |
2011 | PEP GTDH |
Project | Dates | Area |
---|---|---|
Installation and Commissioning of a new Control System for TG-1 Turbo-Generator Package (Rolls-Royce Allison 501-KB5S) on Pemex, APC. AKAL-GC. Including, installation, testing, configuration and commissioning. |
2011 | PEP RMNE |
Project | Dates | Area |
---|---|---|
Refurbishment of a 2.5MW; Turbo-Generator Package (Rolls-Royce Allison 501-KB) to a 3.5MW; Turbo-Generator Package (Rolls-Royce Allison 501-KB5) including;Overhaul of the gas generator 501KB; No.ASP-142. Pemex, APLT, Abkatun-D. |
2013 | PEP RMSO |
Refurbishment of a 2.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB) to a 3.5MW; Turbo- Generator Package (Rolls-Royce Allison 501-KB5) including: Overhaul of the gas generator 501KB; No.ASP-903. Pemex, APAPC, Abkatun-A-Permenente. |
2011-2013 | PEP RMSO |
Removal and Replacement of TG-A 2.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB) with a 3.5MW; Turbo-Generator Package (Rolls-Royce Allison 501-KB5) Pemex, APAPC, Abkatun-A-Permenente. Including: Installation; testing, configuration and commissioning. |
2011 | PEP RMSO |
Refurbishment of a 2.5MW; Turbo-Generator Package (Rolls-Royce Allison 501-KB) to a 3.5MW; Turbo-Generator Package (Rolls-Royce Allison 501-KB5) including; Overhaul of the gas generator 501KB; No.ASP-142. Pemex, APLT, Abkatun-D |
2013 | PEP RMSO |
Refurbishment of a 2.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB) to a 3.5MW; Turbo- Generator Package (Rolls-Royce Allison 501-KB5) including: Overhaul of the gas generator 501KB; No.ASP-903. Pemex, APAPC, Abkatun-A-Permenente. |
2011-2013 | PEP RMSO |
Removal and Replacement of TG-A 2.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB) with a 3.5MW; Turbo-Generator Package (Rolls-Royce Allison 501-KB5) on; Pemex, APAPC, Abkatun-A-Permenente. Including: installation, testing, configuration and commissioning. |
2011 | PEP RMSO |
Project | Dates | Area |
---|---|---|
Training Course for the Operation and Maintenance of the FT-55 Control Systems on the Reciprocating Compressors (Cooper-Bessemer; GMVA-8) at Pemex, Castarical, Region Sur |
2011 | PEP Region Sur |
Project | Dates | Area |
---|---|---|
Modernization of the Control Systems on Compression Modules No.4 & 5 (Rolls-Royce RB211) at CPTG; Atasta; including; Installation, testing, configuration and commissioning. |
2011 | PEP GTDH |
Project | Datess | Area |
---|---|---|
Installation and Commissioning of a new Control System for TG-1 Turbo-Generator Package (Rolls-Royce Allison 501-KB5S) on Pemex, APC, AKAL-GC. Including; installation, testing, configuration and commissioning. |
2011 | PEP RMNE |
Project | Dates | Area |
---|---|---|
Refurbishment of a 2.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB) to a 3.5MW; Turbo- Generator Package (Rolls-Royce Allison 501-KB5) including: Overhaul of the gas generator 501KB; No.ASP-903. Pemex, APAPC, Abkatun-A-Permenente. |
2011-2013 | PEP RMSO |
Removal and Replacement of TG-A 2.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB) with a 3.5MW; Turbo-Generator Package (Rolls-Royce Allison 501-KB5) on Pemex, APAPC, Abkatun-A-Permenente. Including: installation; Testing, configuration and commissioning. |
2011 | PEP RMSO |
Project | Dates | Area |
---|---|---|
Refurbishment of a 2.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB) to a 3.5MW; Turbo- Generator Package (Rolls-Royce Allison 501-KB5) including: Overhaul of the gas generator 501KB; No.ASP-903. Pemex, APAPC, Abkatun-A-Permenente. |
2011-2013 | PEP RMSO |
Removal and Replacement of TG-A 2.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB) with a 3.5MW; Turbo-Generator Package (Rolls-Royce Allison 501-KB5) on Pemex, APAPC, Abkatun-A-Permenente. including: installation, testing, configuration and commissioning. |
2011 | PEP RMSO |
Project | Dates | Area |
---|---|---|
Modernization of the Control Systems on Compression Modules No.4 & 5 (Rolls-Royce RB211) at CPTG, Atasta; including installation, testing, configuration and commissioning. |
2011 | PEP GTDH |
Project | Dates | Area |
---|---|---|
Installation and Commissioning of a new Control System for TG-1 Turbo-Generator Package (Rolls-Royce Allison 501-KB5S) on Pemex, APC, AKAL-GC. Including; installation, testing, configuration and commissioning. |
2011 | PEP RMNE |
Project | Dates | Area |
---|---|---|
Supply; Installation and Operation of Temporary Electrical Supply Motor Generators 2x1MW; on Pemex; APAPC, Abkatun-N1. |
2014-2015 | PEP RMSO |
Supply; Installation and Operation of Temporary Electrical Supply Motor Generators 2x1MW; on Abkatun-A; Pemex, APAPC, Abkatun-N1. |
2013-2014 | PEP RMSO |
Refurbishment of a 2.5MW Turbo-Generator Package (Rolls-Royce Allison 501-KB) to a 3.5MW; Turbo- Generator Package (Rolls-Royce Allison 501-KB5) on Abkatun-A-Permenente; including: Overhaul of the gas generator 501KB; No.ASP-903. Pemex, APAPC. |
2011-2013 | PEP RMSO |